Request a Call Back
Zaasna - Shapoorji Pallonji Parkwest
loading..

Shapoorji Pallonji Parkwest

by Shapoorji Pallonji Real Estate
Developer logo

RERA : Maple- PRM/KA/RERA/1251/310/PR/171015/000277 | Sapphire- PRM/KA/RERA/1251/310/PR/171015/000284 | Magnolia- PRM/KA/RERA/1251/310/PR/180222/002637 | Mahogany- PRM/KA/RERA/1251/310/PR/181204/002196

2 and 3 BHK Premium Green Homes in Binnypet Central Bengaluru

Address

Binnypet

Configuration

1 BHK | 2 BHK | 3 BHK | 4 BHK+ |

Possession Date

Maple- Dec'20; Sapphire- Dec'21; Magnolia- Apr'22; Mahogany- Mar'23

Total Area

46.39 acres

No. of Units

3000 units

Base Price

7285/sft

site-visit
shortlist

Overview
A home thats powered by nature and surrounded by green.With 46 acres of development, Parkwest is Shapoorji Pallonji first residential project in Central Bengaluru. It aims to bring back the tranquility and freshness of nature to the heart of the city, with lush greenery all around.At Parkwest, homes are specifically designed to keep monetary, energy,and water savings in mind. The flats are designed from the ground up to be green, clean, and in agreement with the environment.

Plans and schematics are provided by developer and are subject to change.

Master Plan

Expand Image master plan

Floor Plan
Specification

Structure

Plastering

  • Earthquake resistant structure (Seismic Zone II compliant)
  • Internal walls smoothly plastered (for wall – gypsum plaster, for ceiling gypsum punning)

Flooring

Common Areas

  • Vitrified flooring for living, dining and family areas (1200 x 800)
  • Laminated wooden flooring in master bedroom and vitrified flooring in other bedrooms (1200 x 800)
  • Vitrified flooring in kitchen (1200 x 800)
  • Anti-skid ceramic flooring in balcony and utility area
  • Ceramic flooring for maid’s room
  • Elegant double height ground floor entrance lobby
  • Flooring in marble
  • Upper floors lobby flooring and cladding in vitrified tiles up to false ceiling height
  • Granite dado around lift door.
  • Staircase flooring in kota, with water/oil bound distemper paint on walls and ceiling.
  • Grouping of passenger elevators of reputed make.

Painting and Polishing

Kitchen

  • Interior walls finished with acrylic emulsion paint and ceiling with water/oil-bound distemper
  • Exterior walls with textured/emulsion paint
  • Enamel paint for MS railings
  • Maid’s room walls and ceiling with water/oil bound distemper
  • Provision for modular kitchen.
  • Provisions for water purifier, refrigeration point and washing machine

Doors

Windows

Main Door

  • 8 feet tall pre-engineered door frames and shutters finished with teak veneer and melamine polish on both sides
  • Good quality hardware of Godrej, Haffle, Doorset or equivalent make.

 

Other Internal Doors

  • 7 feet tall pre-engineered door frames with commercial flush
  • Good quality hardware of Godrej, Haffle, Doorset or equivalent make.
  • All internal doors are flush doors with laminate
  • All toilets are flush door with waterproof laminate
  • UPVC sliding doors with fly mesh for all decks
  • UPVC sliding windows with fly mesh - (no fly mesh in UPVC casement windows)
  • Safety grills with enamel paint for all windows up to second floor
  • Safety grills in utility area for all floors

 

Toilets

CP Fittings

  • Anti-skid ceramic tiles flooring and ceramic tiles dado in all toilets
  • Granite vanity counter top with ceramic wash basin in all the toilets
  • Sanitary ware (wash basin, EWC) in all toilets of Kohler, TOTO, Duravit, Vitra or equivalent make.
  • Toughened glass Shower Panel with Door only in Master bathroom
  • Mirror, toilet paper holder, soap tray and towel rod in all toilets.

 

 

  • Concealed flush tanks for all toilets
  • Concealed diverter for shower of Kohler, Grohe or equivalent.
  • Health faucet of Kohler, Grohe or equivalent make.
  • Provision for storage water heater in each toilet
  • Exhaust fan in all toilets

 


Payment Schedule
Particulars Value
Payable on Completion of 20th Level Floor Slab 13 %
Payable on Completion of CP & Sanitary Fittings 13 %
"Payable on Registration of Sale Deed or on receipt of Occupation Certificate “whichever is earlier" 5 %
First Part of Earnest Money 5 %
Second Part of Earnest Money (payable within 30 days from First Part of Earnest Money) 5 %
First Instalment Payable within 30 days from Signing of the Agreement 10 %
Payable on Completion of Foundation 5 %
Payable on Completion of Ground Level Floor Slab 9 %
Payable on Completion of 6th Level Floor Slab 9 %
Payable on Completion of 13th Level Floor Slab 9 %
Total 100 %

About Developer
Developer logo
We are a well-diversified business house, with clients in over 60 countries, delivering complex and challenging projects for over 150 years. We operate in 6 major business areas with 13 group companies and a strong employee base of over 60,000 people from across 40+ nationalities. Above all, we are engineers at the core, committed to delivering projects and solutions globally with the help of breakthrough technology that will leave an impact for generations to come. We continue to leverage our culture of innovation, our deep engineering expertise and our state of the art Health Safety and Environment processes to help make everyday life better.
`